Monday, June 13, 2016
Beginning at 7:30 AM on Monday, June 20 through 3:30 PM on Thursday, June 23, repair work is scheduled on the Green Bank Bridge over the Mullica River between Atlantic and Burlington counties in cooperation with the US Coast Guard, that will prohibit waterway vessels requiring vertical clearance greater than that provided by the bridge in its closed position.
Questions regarding vessel clearance may be directed via marine radio channel 13 or by calling the bridge operator at (609) 965-3034.
The bridge will remain open to roadway traffic during this period.